BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption

M. (Mohamad) Kassem, T. (Trevor) Brogden, N. (Nashwan) Dawood

Research output: Contribution to journalArticleResearchpeer-review

Original languageEnglish
JournalJournal of Construction Engineering and Project Management
Volume2
Issue number4
DOIs
Publication statusPublished - 2012

Cite this

@article{15ddb5a0762f4d3f964d137b4603292a,
title = "BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption",
author = "Kassem, {M. (Mohamad)} and Brogden, {T. (Trevor)} and Dawood, {N. (Nashwan)}",
year = "2012",
doi = "10.6106/JCEPM.2012.2.4.001",
language = "English",
volume = "2",
journal = "Journal of Construction Engineering and Project Management",
issn = "2233-9582",
publisher = "Korea Institute of Science and Technology Informaiton",
number = "4",

}

BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption. / Kassem, M. (Mohamad); Brogden, T. (Trevor); Dawood, N. (Nashwan).

In: Journal of Construction Engineering and Project Management, Vol. 2, No. 4, 2012.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption

AU - Kassem, M. (Mohamad)

AU - Brogden, T. (Trevor)

AU - Dawood, N. (Nashwan)

PY - 2012

Y1 - 2012

U2 - 10.6106/JCEPM.2012.2.4.001

DO - 10.6106/JCEPM.2012.2.4.001

M3 - Article

VL - 2

JO - Journal of Construction Engineering and Project Management

JF - Journal of Construction Engineering and Project Management

SN - 2233-9582

IS - 4

ER -