Abstract
An integrated approach, which optimizes the production and utility system simultaneously, is commonly used to arrive at an optimal scheduling solution. For the large-scale complex industrial systems, this approach requires extensive computational time. The main aim is to investigate the capability of the proposed decomposition strategy to find optimal or near-optimal solutions with relatively low computational effort. The computational results showed that the proposed three-stage decomposition strategy achieves the optimal solutions four times faster than the integrated approach. Also, a sensitivity analysis of emissions cap on the total cost was performed. It was shown that the minimum possible emissions cap (365 t/h) resulted in a 1.2% reduction in total emissions. Overall, the proposed mixed-integer programming (MIP)-based decomposition strategy could be used as an intermediary approach that combines the benefits of the sequential and integrated approach in terms of faster computational time and higher productivity of the overall system.
Original language | English |
---|---|
Article number | 106634 |
Journal | Computers and Chemical Engineering |
Volume | 133 |
DOIs | |
Publication status | Published - 2 Feb 2020 |
Externally published | Yes |
Bibliographical note
Funding Information:The financial support under the Scheme of Academic Training Reward (470/2015/41) from the Ministry of Education, Malaysia is gratefully recognized for the realization of this research work.
Publisher Copyright:
© 2019