Abstract
As time goes on and building practices change, procedures that at one point seemed indispensable can fall by the wayside. One such example is the bill of quantities (B/Q). Research into the extant literature attributes declining use of B/Qs to a multitude of reasons, such as its complexity and potentially drawn-out time to produce, non-traditional procurement systems growing in popularity and the challenge of using its information in a construction schedule. With these issues in mind, a combined process of Building Information Modelling (BIM), Virtual Reality (VR) and including the client in the design process has been proposed as a potential solution. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client’s design decisions on window and interior furnishings, specifically. Their choices made using VR automatically updated a B/Q Revit Schedule and allowed the client to have a firm grasp on the project costs. Not only did this process give the client more confidence in a pleasing final outcome, but the technology ensured an up-to-date, accurate and easily understood B/Q. Here lies great potential savings in cost, time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper was a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.
| Original language | English |
|---|---|
| Journal | Frontiers of Engineering Management |
| DOIs | |
| Publication status | Published - 15 Jun 2019 |
Fingerprint
Dive into the research topics of 'Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: a proof of concept study'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver