Skip to main navigation
Skip to search
Skip to main content
Teesside University's Research Portal Home
Search content at Teesside University's Research Portal
Home
Profiles
Research units
TeesRep
Student theses
Projects
Datasets
Equipment
Press/Media
Probabilistic performance assessment of a coal-fired power plant
D. P. Hanak
, A. J. Kolios
, C. Biliyok
, V. Manovic
Net Zero Industry Innovation Centre
Research output
:
Contribution to journal
›
Article
›
peer-review
31
Link opens in a new tab
Citations (Scopus)
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Probabilistic performance assessment of a coal-fired power plant'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Coal-fired Power Plant
100%
Safety Factor
100%
Reliability Index
100%
Probabilistic Evaluation
100%
Design Process
50%
Key Performance Indicators
50%
Performance Assessment
50%
Environmentally Friendly
50%
Service Time
50%
High Reliability
50%
Cost of Capital
50%
Energy Sources
50%
Index-based
50%
Power System
50%
Operating Cost
50%
Estimation Accuracy
50%
Process-based
50%
Low Carbon
50%
Non-intrusive
50%
Plant Equipment
50%
Approximation Methods
50%
Deterministic Model
50%
Environmental Policy
50%
Equipment Failure
50%
Power Plant Performance
50%
Equipment Oversizing
50%
Deterministic Forecast
50%
Stochastic Methodology
50%
Power Plant Equipment
50%
Reliable Assessment
50%
Low-cost Operations
50%
Maintenance Intervention
50%
Low Capital Cost
50%
Performance State
50%
Engineering
Capital Cost
100%
Fired Power Plant
100%
Operating Cost
100%
Plant Equipment
100%
Reliability Index
100%
Safety Factor
100%
Electric Power Plant
100%
Design Process
50%
Key Performance Indicator
50%
Power Engineering
50%
Service Time
50%
Applicability
50%
Main Source
50%
Performance State
50%
Earth and Planetary Sciences
Coal-Fired Power Plant
100%
Performance Assessment
100%
Safety Factor
100%
Plant Equipment
100%
Environmental Policy
50%
Probability Theory
50%
Coal Policy
50%